Western Mining’s 100,000-ton electrolytic zinc project adopted the world’s most advanced oxygen pressure leaching technology for zinc smelting. Zhejiang Lantian provided mechanical seal systems for its high-pressure reactors, with a service life of up to 10 years. The automated sealing system is equipped with equipment monitoring and functional alarms, making our company one of the earliest domestic suppliers providing localized equipment for hydrometallurgical technologies with stable and reliable performance.
Western Mining’s 100,000-ton electrolytic zinc project adopted the world’s most advanced oxygen pressure leaching technology for zinc smelting. Zhejiang Lantian provided mechanical seal systems for its high-pressure reactors, with a service life of up to 10 years. The automated sealing system is equipped with equipment monitoring and functional alarms, making our company one of the earliest domestic suppliers providing localized equipment for hydrometallurgical technologies with stable and reliable performance.1.jpg)
In December 2020, the Guyuan complex molybdenum ore oxygen pressure leaching technical renovation project passed completion acceptance. As an independent R&D achievement transformed during the 13th Five-Year Plan period, it built the first domestic oxygen pressure leaching production line for raw ore associated with uranium and molybdenum, pushing the green and efficient mining and metallurgy technology as well as engineering application system for uranium-molybdenum ore to an internationally advanced level. Zhejiang Lantian supplied mechanical seal systems for its high-pressure reactors, which have been operating stably and reliably since commissioning.2.jpg)

2.jpg)
1.jpg)